Requalification and development of renewable energy sources requested by the Turin local council
Feasibility study for the cycle lane to overcome the narrowing at the “Stretta del Pescale” point to continue the existing cycle lane on the left bank of the Secchia River
Restoration of the navigation basin at Panperduto on the Ticino River
Hydroelectric plant to be placed on the left bank of the Enza River in the municipality of Traversetolo, province of Parma
Hydroelectric water-flow plant on the state owned canal of the Enza River
Production of renewable energy, mini-hydro plant, land and environment
Safety adjustments for the historical lifting system in Moglia di Sermide
Energy and environmental renovation of the A. Gemelli University Hospital in Rome