Basin in Bomporto

Urgent engineering works: water safety for Bomporto

Sistemazione argine e conca a Bomporto, Binini Partners, Società di architettura e ingegneria

Urgent engineering works: water safety for Bomporto

Urgent repairs of the bank wall of the Naviglio Canal upstream from Bomporto (province of Modena).
Executive project and work supervision assistance for AIPO for the urgent reconstruction work for the bank wall and the consolidation of the raised bank on the right side of the Naviglio Canal.
The specialist work was made necessary after finding unexpected elements along the bank that threatened its stability and the opportunity to adjust it.
The project and its realisation were studied and activated in record time, between August and September 2016, before the autumn wet season, at least for the section needed to make the inhabited areas safe. Then, in spring, with more favourable weather, the finishing and furnishing work was done.

Sistemazione argine e conca a Bomporto, Binini Partners, Società di architettura e ingegneria
Sistemazione argine e conca a Bomporto, Binini Partners, Società di architettura e ingegneria

The area is located upstream from the intake canal of the historical basin of the Naviglio Canal, which was once part of a duchy, before it flows into he Panaro River. It is a point of great historical and architectural interest, both for the basin and the antique upstream mandracchio as well as the bridge over the downstream gate, a complex waterway hub to be preserved and put on show despite\ the urgency with a careful organisation of the executive phases and the work for each one.
The solution to the problem was found using a wall of crossed armoured beams, positioned along the canal bottom which could withstand the push of the land and avoid the syphoning phenomena on the bank. The work was done after the installation of paths and guides with a temporary site protected by a barrier that extended to half of the bed.
The next step, once everything was made safe, was to complete the brick wall covering, attached to the historical works and the complete restructuring and lifting of the bank.
All of the documents, including the technical and administrative ones were drafted for the variation survey certification and the management of the tender for ongoing works to support the AIPO technicians.

Sistemazione argine e conca a Bomporto, Binini Partners, Società di architettura e ingegneria
Sistemazione argine e conca a Bomporto, Binini Partners, Società di architettura e ingegneria
Sistemazione argine e conca a Bomporto, Binini Partners, Società di architettura e ingegneria
Sistemazione argine e conca a Bomporto, Binini Partners, Società di architettura e ingegneria
Sistemazione argine e conca a Bomporto, Binini Partners, Società di architettura e ingegneria
Sistemazione argine e conca a Bomporto, Binini Partners, Società di architettura e ingegneria
Sistemazione argine e conca a Bomporto, Binini Partners, Società di architettura e ingegneria
Sistemazione argine e conca a Bomporto, Binini Partners, Società di architettura e ingegneria
Sistemazione argine e conca a Bomporto, Binini Partners, Società di architettura e ingegneria
Sistemazione argine e conca a Bomporto, Binini Partners, Società di architettura e ingegneria
Sistemazione argine e conca a Bomporto, Binini Partners, Società di architettura e ingegneria
Sistemazione argine e conca a Bomporto, Binini Partners, Società di architettura e ingegneria

Basin in Bomporto


Client:
:
AIPO, Modena Operative Office

Year of execution:
2016

Service level performed:
Executive project and variation survey certification for high urgency

Work progress:
Concluded and realised

Cost:
€ 418.000,00

Project/service signatory technicians:
Eng. Tiziano Binini, Eng. Gianluca Lombardi,

Sistemazione argine e conca a Bomporto, Binini Partners, Società di architettura e ingegneria
Sistemazione argine e conca a Bomporto, Binini Partners, Società di architettura e ingegneria

Basin in Bomporto
Urgent engineering works: water safety for Bomporto