Study of the basins of the Adda, Brembo and Serio Rivers
Water and environment analysis and river project layout
Land and environment defence, water safety, adding value to the landscape and local tourism
The feasibility study, developed under the PAI, Piano per l’Assetto Idrogeologico (Plan for hydrogeological layout), includes all the preliminary analyses and surveys with aerial photos, maps and hydrological information required for the construction of the digital model of the river area, including the registration of the hydraulic or affecting structures.
All of this was performed to develop the hydrogeological model, the analysis of the natural and ecological layout, risk analysis and the definition of the river areas, all the way up to the project draft and the general maintenance plan of the waterways. Binin Partners, which was part of the RTI organisation which won the tender, assumed the management of the project and developed the studies and the analyses for the definition of the natural and ecological layout, as well as design of the project layout to be implemented, with reference to the land defence objectives set by PAI.
Client:
Autorità di Bacino del Fiume Po – Parma
Start date:
2001
End date:
2006
Project, service signatory technicians:
Binini Partners S.r.l.
Eng. Tiziano Binini
Study of the basins of the Adda, Brembo and Serio Rivers
Water and environment analysis and river project layout