Ferrari plant in Maranello

Improvement of living conditions of the revision and finishing departments

Stabilimento Ferrari a Maranello, Binini Partners, Società di architettura e ingegneria

Design and work supervision for building systems to improve working conditions in the revision and finishing departments with the aim of improving cleanliness, the living conditions and the comfort of the employees on the revision and finishing lines.
The work was done on the heating and cooling systems of the departments mentioned thanks to the installation of refrigeration units, of the cold water connections, the air conditioning unit and the air distribution system.
All of this activity was performed without interrupting factory work and without causing damage to the cars on the line.

To reach the objectives set by Ferrari S.p.A. steel structures were used and a technical compact positioning overhang of the technical machines in the little space available outside of the buildings. The project also included connection lines and suspended distribution tubes in micro perforated fabric in red Ferrari colour that characterises the image of the production and work line spaces.

Ferrari plant in Maranello


Client
:
FERRARI S.P.A.

Service level performed:
Executive design, supervision, work measurement and accounting, functional technical test

Work progress:
Concluded and performed

Project /service signatory technicians:
Binini Partners S.r.l.
Eng. Tiziano Binini