Adjustment of the Enza, Po and Crostolo River embankments

Executive project for the adjustment of embankments and structures

Adeguamento idraulico argini Enza, Po e Crostolo, Binini Partners, Società di architettura e ingegneria

Executive project for the adjustment of the embankments and structures affecting the services of the Consorzi di Bonifica (territorial waterway agency) and the Parma-Suzzara railway, along the Po River and overflows of the Enza and Crostolo Rivers in the municipalities of Boretto, Gualtieri and Guastalla

Priority intervention following the flooding in October 2000 for the safety of the Reggio Emilia lowland areas (Ordnance of the Protezione Civile (territorial safety agency) n. 3090 of 18/10/00 and successive).

Adeguamento idraulico argini Enza, Po e Crostolo, Binini Partners, Società di architettura e ingegneria
Adeguamento idraulico argini Enza, Po e Crostolo, Binini Partners, Società di architettura e ingegneria

The assignment includes the following:

  • topographic and elevation profile;
  • geological and geotechnical survey;
  • hydraulic and hydrogeological reports;
  • preliminary design;
  • definitive design;
  • executive design;
  • safety coordination in the design phase;
  • mapped plans of expropriation and expropriation estimates;
  • work supervision;
  • measurements and accounting for works;
  • safety coordination in the execution phase

Adjustment of the Enza, Po and Crostolo River embankments


Client
:
AIPO – Agenzia Interregionale per il fiume Po
Consorzio di Bonifica Bentivoglio Enza
Consorzio di Bonifica Parmigiana Moglia Secchia

Total adjustment work costs:
30000 million Italian Liras

Executive project work costs delivered on 06/07/2001 and approved with presidential deliberation n. 13303 of 14/08/2001:

  • Earth works (VIIA) Liras 3.820.848.952 € 1.973.303,80
  • Expropriations (VIIA) Liras 590.000.000 € 304.709,57
  • Artwork (IXB) Liras 4.379.151.048 € 2.261.642,77

Total works Liras 8.790.000.000 € 4.539.656,14

Work costs following an additional survey and variation (Survey n. 1 proved by RUP on17/10/2002):

  • Earth works (VIIA) Liras 3.819.183.408 € 1.972.443,62
  • Expropriations (VIIA) Liras 936.610.336 € 483.718,87
  • Artwork (IXB) Liras 4.379.151.048 € 2.261.642,77

Total works Liras 9.134.944.792 € 4.717.805,26

Assignment cost:
€ 306.588,95 (excluding INARCASSA and VAT)

Project/service signatory technicians:
Binini Partners S.r.l.
Eng. Tiziano Binini, Eng. Cristian Torelli, Eng. Alberto Baroni, Eng. Giovanni Frati