Adjustment of the Enza, Po and Crostolo River embankments
Executive project for the adjustment of embankments and structures
Executive project for the adjustment of the embankments and structures affecting the services of the Consorzi di Bonifica (territorial waterway agency) and the Parma-Suzzara railway, along the Po River and overflows of the Enza and Crostolo Rivers in the municipalities of Boretto, Gualtieri and Guastalla
Priority intervention following the flooding in October 2000 for the safety of the Reggio Emilia lowland areas (Ordnance of the Protezione Civile (territorial safety agency) n. 3090 of 18/10/00 and successive).
The assignment includes the following:
Client:
AIPO – Agenzia Interregionale per il fiume Po
Consorzio di Bonifica Bentivoglio Enza
Consorzio di Bonifica Parmigiana Moglia Secchia
Total adjustment work costs:
30000 million Italian Liras
Executive project work costs delivered on 06/07/2001 and approved with presidential deliberation n. 13303 of 14/08/2001:
Total works Liras 8.790.000.000 € 4.539.656,14
Work costs following an additional survey and variation (Survey n. 1 proved by RUP on17/10/2002):
Total works Liras 9.134.944.792 € 4.717.805,26
Assignment cost:
€ 306.588,95 (excluding INARCASSA and VAT)
Project/service signatory technicians:
Binini Partners S.r.l.
Eng. Tiziano Binini, Eng. Cristian Torelli, Eng. Alberto Baroni, Eng. Giovanni Frati