The new hospital in Moncalieri and the Casa della Salute (Health centre) in Nichelino
Feasibility study for the cycle lane to overcome the narrowing at the “Stretta del Pescale” point to continue the existing cycle lane on the left bank of the Secchia River
Restoration of the navigation basin at Panperduto on the Ticino River
Reorganisation and development plan for the Arcispedale Santa Maria Nuova Hospital in Reggio Emilia
Water and earthquake safety: adjustment study of the waterway system of Moglia di Sermide
5 Laboratories at the healthcare structure of the Rome G department
Urgent engineering works: water safety for Bomporto
Hydroelectric plant to be placed on the left bank of the Enza River in the municipality of Traversetolo, province of Parma
Creation of the Ponterosso by-pass in the town of Castelnovo Ne’ Monti (RE)
New road section by-passing the Pedemontana axis (road running parallel to the Apennine foothills)