New San Giuseppe Bridge – Cesenatico
The hospital for 21st century healthcare: the new IRCCS Galeazzi
Un passo avanti. Una soluzione per ripartire. Una innovazione per tutti.
A step forward. A solution to start again. Innovation for everyone.
Project for navigation along the Po River
Requalification and development of renewable energy sources requested by the Turin local council
Feasibility study for the cycle lane to overcome the narrowing at the “Stretta del Pescale” point to continue the existing cycle lane on the left bank of the Secchia River
Restoration of the navigation basin at Panperduto on the Ticino River
Restoration of the “Maddalena 2” navigation basin of the Canale Industriale at Panperduto
Hydroelectric plant to be placed on the left bank of the Enza River in the municipality of Traversetolo, province of Parma